page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81 page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
79
(d = 6Qdesign
) = 0.410 m or 410 mm
Ð c hbasin + h flush
( )d = 4Qdesign
Ðc h flush
= 0.386 m or 386 mm
Terefore, a diameter of 410 mm is required for the flush pipe.
The actual flush pipe diameter that was used for the Galkot scheme is 400 mm (slightly smaller than calculated). This was accepted
because it matches the penstock diameter and was easier to fabricate.
Box 5.1 Jhankre settling basin
The Jhankre mini-hydro scheme is
a rare example where it was pos-
sible to combine the gravel trap, set-
tling basin and forebay into one
structure as can be seen in Photo-
graph 5.8 and Figure 3.8 (Chapter
3). The intake is located at the left
bank of a wide pool and there was
adequate space to combine all three
structures here. Also, the topogra-
phy was such that it was possible
to start the penstock alignment right
at the intake.
The gravel trap is placed at the
curved section immediately behind
the intake. The straight section be-
hind the gravel trap works as a set- Photo 5.8 Gravel trap, settling basin and forebay of Jhankre mini-hydro
tling basin and the tank behind this
is the forebay. Since the initial pen-
stock alignment is buried it cannot be seen in the photo-
Platforms have been incorporated at the end of the gravel
graph. Also note that as discussed earlier, the structure
trap, settling basin and above the forebay to facilitate flush-
has been divided into two basins so that the plant need not
ing as well as cleaning of the trashrack. The flushing sys-
be completely shut during flushing.
tem for both gravel and sediment is a modification of the
“vertical flush pipe” method. As shown in Figure 5.7,
instead of a flush pipe a cylinder (tapered at the bottom)
is used which fits snugly into the hole on the basin floor.
Since the water depth is high, the cylinders are lifted
with spindle wheels (thus gaining mechanical advan-
tage) that rest on the slabs. However, note that with this
system, the excess flow cannot be diverted via the
cylinders since they are closed on top.
Figure 5.7 Flushing system of Jhankre mini-hydro
The trashrack at the forebay is cleaned by raking
through the bars (flat plates) with a special steel rake.
To prevent vandalism the spindle wheels are stored
separately and installed only during flushing. In the pho-
tograph the threaded ends (where the spindles are in-
serted) can be seen on the gravel trap and settling
basin platforms.